Portal de Lorca

www.portaldelorca.com

Lorca - SpanishLorca - English
detail of Lorca

 

The City Council added the Calle Lorca Turbinto the remodeling of the district of San Cristobal (12/05/2010)

The Consistory 91,892.56 euros invested in the renovation of 500 m2 of pavement, improves the network of water supply, sanitation and rainwater, underground containers and 10 new streetlights.

The refurbishment will leave with paving stones 60 meters of sidewalk and driveway at the same level.

Councilman Hall Works of Lorca, Angel Mecca, visited this morning the municipal works Turbinto Street, in addition to the comprehensive redevelopment plan for San Cristobal district is implementing the Local Government for three years.

Mecca has explained that the project, which is already underway, involves an investment of EUR 91,892.56 from the Plan of neighborhoods and districts funded by the Regional Government and the Consistory, which will enable the transformation of the street in both surface underground services.

So be installed 500m2 of cobblestone pavement, leaving the sidewalk and the road to the same level on concrete slab 10 cm and 20 cm.

of gravel.

Prior to surface treatment of the street, it is proceeding with underground public lighting services, telephony, medium and low voltage, while the municipal utility Aguas de Lorca is the process of renewing the distribution network water and the creation of a new sewage system and rainwater collection.

To end the performance, three units are burying containers of waste collection and street lamps installed ten units Neofernandina model of ductile iron.

Mecca has stressed that "this work is part of personal commitment as has the mayor rabalero Lorca, Francisco Jodar, to improve the quality of life for residents of Barrio de San Cristóbal.

In this sense, the works Councilwoman recalled that "the City in the last two years has completely remodeled the main streets, Ortega Melgares, Plaza of Vegetables, and 40 streets in the area Pibal del Barrio de San Cristóbal, emphasizing the creation of Placeta Cruz de Sola and expansion of Cuevas de Mena Street, to improve access to emergency vehicles. "

"In addition, they built the College sports hall of San Cristobal, the works were completed the Public School and Sacred Heart is to expand the Civic Center, among many other actions that are planned as Charco Street," recalled Councilman .

Not forgetting the benefits it will bring this area the launch in September this year the University Campus of Lorca and the construction of the new Institute for Middle and High School.

Source: Ayuntamiento de Lorca

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información