Portal de Lorca

www.portaldelorca.com

Lorca - SpanishLorca - English
detail of Lorca

 

Francisco Jodar, "each lorquino rebuilding your home is an example for all" (06/05/2016)

Mayor visits the building Mormar neighbors, who have completed their reconstruction.

It is a block of 15 apartments and low commercial.

With the completion of this building the number of reconstructed housing (786) has overtaken that of housing reconstruction (773).

The Mayor of Lorca, Francisco Jodar, said that each lorquino rebuilding your home is an example of improvement for the entire city, for all residents, and constitutes a substantial advance for further progress in the process we are developing together to lift the new Lorca.

In fact today we deliver to neighbors Edifico Mormar their corresponding certificates of occupancy, once the reconstruction.

Francisco Jodar said Lorca in every improvement we made a virtue of necessity, the reconstructed buildings are better than those who suffered the consequences of earthquakes.

The real estate Lorca Park now has safer, more efficient and accessible buildings.

Those who had no elevator or garage now do have before.

We also have new districts thanks to the courageous and decisive investments in the region.

Have been improved connections between neighborhoods, improved aesthetics and all underground services and create more spaces for the neighborhood enjoy as parks, playgrounds or sports resources.

The mayor explained that in the case of building reconstruction process culminates today are rebuilt 17 homes, which together with those who have already completed their rebuilding in the municipality with a total of 786 homes.

There are already 37 reconstructed buildings with a total of 739 homes, which is necessary to add the 47 reconstructed houses.

Other 773 homes continue with their work, being in a very advanced state.

Every month that passes is more and more families returning home.

This is the most important process that is living Lorca from May 2011.

The Mormar building has an area of ​​2,027 m2.

We are talking about a block of 5 floors with 3 flats each, while on the sixth floor were built two houses.

Ground floor also has two diaphanous premises of 176 m2 and 93 m2, respectively.

In one of them you will return and install the Bar El Quijote, which is already in the process of opening license.

Remember that to allow rebuilding the City Council a Special Internal Reform Plan welcomed the complementary rules approved by the Consistory after the earthquake was processed.

And with the General Plan of 2005 he could not lift as was the building before its demolition.

This PERI was processed and approved in just four months favoring reconstruction, while in any other municipality the process had lasted over a year and a half.

It is recalled that the earthquakes of 2011 caused 60,000 people had to hastily leave their homes.

After a total 24,000 homes have been repaired and inhabited 1,152 were demolished.

Forced Replacement Act, promoted by the City Council and approved by the Regional Assembly has unlocked the reconstruction of more than 80 buildings, highlighting its volume Barrio de San Fernando.

The City Council, with the aim of promoting the rebuilding of homes, redoubled efforts from the municipal area of ​​Urbanism, cutting, for example, the approval period of the Special Internal Reform Plans (PERI) from 14 months to just 4.

Source: Ayuntamiento de Lorca

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información