Portal de Lorca

www.portaldelorca.com

Lorca - SpanishLorca - English
detail of Lorca

 

The Department of Education allocates € 32.823,53 in performing a battery of improvements in 8 schools and the library Pilar Barnes (12/07/2016)

Sacred Heart College receives a total of 16,160.76 euros to generate new areas of shade for pupils, replacement and upgrading of carpentry, and placement of trees.

In addition, he shall be provided with an alarm system.

The Councillor for Education in the City of Lorca, Francisco Montiel, has reported that the city council is developing a battery of works in different schools in our municipality with the aim of improving its facilities.

This is a series of actions we do every year taking advantage of the summer vacation period that manage to avoid interfering with the normal development of classes, since they are empty.

We are talking about some works agreed with the educational community of each of the centers, responsible companies in our city and is scheduled to be finished before the start of the school year.

Montiel Sanchez explained that these interventions are carried to term thanks to the Council's own budget, with an extraordinary contribution in this case from La Caixa.

The actions correspond to repairs and maintenance work.

In detail, at the Colegio San José it is proceeding to the replacement of one of the aluminum windows on the left side of the Hall, which will be replaced with the placement of a new glass, plus a new shade.

It also shall withdraw four other windows and proceeded to plug the holes with masonry cladding, coating and painting.

We are talking about an intervention whose economic pillar is around 4,000 euros.

The mayor of Education has indicated that at school Sacred Heart of Jesus will put a set of five sliding canvas awnings PVC profile structure white aluminum, to cover an area of ​​about 140 m2 of playground Children's education has a budget of 8,822.11 euros.

This center will be the subject of another investment of 5.832,20 € for the supply and planting of 10 trees of the variety "fruitless mulberry tree" in the general recreation yard between the sports school with its corresponding complementary civil works, installation drip irrigation, tree pits formation and replacement of pavement.

The aim is to provide the center of a new shadow areas.

The actions to improve the Sacred Heart school also include the installation of an interior warning siren emergency in Hall Early Childhood Education four resettable buttons and a siren external warning installed on the facade, as well as power wiring and connection to the main building, which represent an investment of 937.75 euros.

In these works, the replacement includes several broken handles, locks and bowlers eight inner doors and placing lock with handle and lock cylinder opening with the same key three doors locksmith access, counting with € 568.70.

The mayor of Education has indicated that at the Colegio San Juan de Morata will proceed to the placement of four doors interior woodwork, painted and repair another by placing lock and handle, a task in which they are to 1137.4 used euros.

The school "Casa del Niño" will receive 932.91 euros for the supply and installation for security reasons a fence of metal mesh for protection hollow yard ramp to early childhood education and another on the perimeter of the alcorque tree located in the same yard.

Battery improvements also covers Perez de Hita and Pilar Soubrier, schools in which, for safety reasons, is to put a new stretch of 66 meters mesh fence simple twist with their corresponding support posts 1, 50 m high, which will be placed over the existing fence separating the two centers, with a budget for this action € 838.53.

Perez de Hita The school also will be improved to place 48 catches in 24 blinds front windows of the first floor of the third building of the school, as 348.48 euros will be invested.

The Councillor for Education explained that other interventions in centers will be as follows:

Colegio Alfonso García López (Purias): 5,445 euros for the replacement for months, general plumbing Pavilion widespread deterioration education due to the location of several breaks in the last primary and rush the general supply from the tank water reserve until this pavilion.

Colegio San Fernando, 2.362,16 € to proceed to the replacement s impairment currently existing drinking fountain in the courtyard facade, with the construction of a new central pole made of a stainless steel button with four taps and basement coated masonry stone material and its corresponding plumbing, drainage and evacuation screen.

Library Pilar Barnes, 1.605,80 € for the supply and installation of accessories complement to the use of toilets based on 5 automatic hand dryer 10 toilet paper and many other caddies, plus 6 soap dispensers.

Alongside these scheduled jobs, representing a total investment of 32,823.53 euros, it is intended to carry out other work related to smaller trades heater, electrical, plumbing, locksmith and masonry taking advantage of the summer vacation students are they will perform in schools and past dates when completed conducting studies may give them details of these.

Source: Ayuntamiento de Lorca

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información