Portal de Lorca

www.portaldelorca.com

Lorca - SpanishLorca - English
detail of Lorca

 

The City Council grants reconstruction license to the neighbors of the Avenida de Portugal building, demolished by the damages of the earthquakes of 2011 (28/06/2017)

It is planned to build a property distributed in 6 floors that would maintain the 8 existing homes and commercial low, incorporating a basement floor of 235 m2 so that each floor has its corresponding storage room.

Councilor for Town Planning in the City of Lorca, Satur Martínez, has reported that the Municipal Consistory, through its Planning and Management area, has granted a license for works to rebuild the Avenida de Portugal building which had to be demolished A few months after the serious damage that the earthquakes of 2011 had caused in its internal structure.

Satur Martínez explained that, according to the documentation presented by the neighbors, who are the promoters of the new building, it is planned to build a block that will have a total of 6 floors, distributed in a basement, ground floor and 4 Heights.

The main novelty of the building will be the habilitation of a basement that will have dimensions of 235 m2, housing in its interior 8 storage rooms that will serve the corresponding 8 houses that would have room in the property.

This basement would also include a space for the deposit of waste by its neighbors as well as other installations of various equipment (communications services, electricity, ...) As in all reconstructions, the new building that has emerged is much better Than the one that was demolished, since it is more accessible, efficient, modern and safe.

The Edil de Urbanismo has detailed that the block of flats will maintain the 8 houses with which it counted before, also conserving the dimensions of each home.

It will incorporate, as an advantageous novelty for the residents, the most modern systems of energy efficiency, term and acoustic insulation, as well as the updated technical criteria in the field of construction safety.

We are speaking, therefore, of an improved building, modern and that responds to the most avant-garde criteria in this area.

The material execution price of the new infrastructure, according to the data provided by the municipal technicians, totals 470,000 euros, with works covering a total area of ​​1,425 m2.

We consider that this is good news for the neighbors after an intense work developed on their part to be able to re-raise their homes.

It is the moment, for our part, to ratify our commitment to the neighbors who lost their residence because of that fateful earthquake, and with whom this city will always keep a debt of gratitude for the personal and family bet that remains behind each and every One of the lorquinos that bet to recover Lorca and to continue advancing until turning the rubble to life and our city in a New Lorca.

Satur Martínez has anticipated that the City Council will continue to promote the full reconstruction of the city, remaining as an invariable criterion established by our Mayor, Fulgencio Gil, always with the Lorca, fighting for their interests and supporting their just demands.

In the specific case of the neighbors of this building, from the Town Hall we want to convey our congratulations to them, hoping that, if there are no unforeseen events of relevance, we can contemplate the beginning of the reconstruction work with the desired promptness.

The Councilor for Urbanism has said that people make a new Lorca, which are improving hundreds of streets, turning the debris into hope and illusion, creating new and large green areas, gaining space to enjoy our city by walking, recovering the Monuments of our heritage legacy and building the Lorca of all.

It should be remembered that more than 95% of the buildings affected by the 2011 earthquake (24,000 homes, 800 commercial premises and 75 buildings of cultural interest) are rehabilitated or undergoing rehabilitation.

It is recalled that 60,000 people had to leave their homes hastily.

The number of inhabited houses demolished after the earthquakes reached 1,152, of which 920 have already been concluded and another 315 are in advanced phase of reconstruction.

Source: Ayuntamiento de Lorca

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información