Portal de Lorca

www.portaldelorca.com

Lorca - SpanishLorca - English
detail of Lorca

 

The neighbors of Lorca neighborhoods gully of Tejares and Santiago bring their proposals to improve urban renewal (04/02/2016)

The General Director of Planning, Architecture and Housing, Nuria Fuentes, and the mayor of Lorca, Francisco Jodar, yesterday held a meeting with neighbors Campuzano cruise the neighborhood of the gully of Tejares, and street and Marsilla Ibreño square in the neighborhood of Santiago, located in the historic town of Lorca, to incorporate its proposals designed to improve these roads.

These steps will be taken under the subsidy that the Ministry of Public Works and Infrastructure granted the city of Lorca to the remodeling of the district of San Cristobal and the districts of Lorca and its surroundings.

Specifically, these actions represent an investment of 397,240 euros, of which 241,922 euros are posted to the central project and 155,317 euros to the neighborhood of the gully of Tejares.

The work will include the complete renovation of underground utilities and pavement, which will look similar to being done throughout the environment, with black cobblestone for rolling vehicle and pedestrian red with a white boundary line treatment.

In crossing Campuzano a hydrant to facilitate the performance of firefighting services and eight lights type LED lamp is installed, the power consumption is less than existing despite providing the same function.

also channeled into the 169.5 meters underground wiring lighting, 528 meters of pipes for the burial of low-voltage lines, and 219 other meters for the burial of telephone networks will be placed.

In addition, 160.84 meters of cast iron pipe and 42.5 meters of polyethylene pipe for water supply network will be installed;

and 183.5 meters of PVC pipes for sewage, which will prevent clogging problems in the future.

more improvements

During the meeting with the residents of the Plaza del Ibreño Marsilla street and explained that the performance respect the essence of this area, retaining elements as the source and its semicircular design.

Similarly, the area will be improved with the creation of a network of 100 linear meters of a network of rainwater collection, independent of 165.2 meters of new pipes to be installed in the sewage system, in order to reduce consequences of the rains.

general supply network with 232 linear meters of pipe will also be renewed, 236 linear meters underground pipeline for the supply of 16 new lights type LED street lighting will be realized and 590 meters of pipeline will be placed for the burial of the low voltage lines and 205 linear meters for telephony.

In addition, the containers are soterrarán at the intersection of the street Marsilla with Santiago.

Source: CARM

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información