Portal de Lorca

www.portaldelorca.com

Lorca - SpanishLorca - English
detail of Lorca

 

The Socialist Party denounced the lack of gutters and rainwater network in the works of San Cristobal turn the streets in torrents in the rainy season (10/10/2016)

The Socialists requests that in planning future regeneration projects both in San Cristobal and others Barrios Altos de Lorca, this infrastructure is implemented to prevent flooding of homes and garages.

The PSOE Councillor David Romera, reported that in the urban regeneration project Cabezo de Casas Blancas neighborhood of San Cristobal, implemented by the Autonomous Community (CARM) through the loan from the European Investment Bank (EIB) for reconstruction of Lorca after the earthquake of 2011, "they have forgotten to include construction on the streets of that neighborhood scuppers and evacuation networks rainwater that collected the waters that flow through them when rainfall occur, especially in the case they are of great intensity. "

David Romera, who recently visited the works that are in the last phase of implementation, has found that "by any stretch of the streets that are being affected by the works of regeneration, have been built scuppers or networks Drainage storm despite the peculiarity of the Cabezo de Casas Blancas ", which, as indicated," its urban fabric is formed by narrow streets of irregular shape with some anchurones and high slope of the same in many sectors. "

As reported, this situation worries many locals who fear the streets, when high-intensity rainfall occur, "become torrenteras why lower lot of water and mud from the highlands in the neighborhood uncontrolled and at high speed, flooding portals and garages, and getting the water to the main streets of San Cristobal, in the low and business side. "

Romera regrets in this regard, "is not taking advantage of the historic opportunity of the regeneration of these areas of Lorca, to give it such an important infrastructure such as networks roof drainage".

The Socialist councilor believes that this situation can still be alleviated.

Therefore urges the Councilman Works, Ms.

Eulalia Ibarra, and therefore to the Regional Directors, in the drafting of the next urban regeneration projects run in the neighborhood of San Cristobal and Barrios Altos City, "is the necessary planning scuppers note networks and rainwater drainage where necessary to prevent the streets of uptown in times of heavy rains become great torrents of water and annoying and dangerous for pedestrians mud, and houses and garages are flooded, for create a more comfortable and attractive to live "city.

The PSOE consider, once again, that this is one more consequence of that "projects that are so important for the future and welfare of the residents of Lorca, are being planned and executed directly by the CARM and not by the City Lorca, who should lead the reconstruction of the city. "

Hence, he says, they are continually appearing problems in neighborhoods of Lorca newly remodeled (La Vina, San Jose, Alfonso X the Wise) or more recently in the administrative processing of the first tranche of the Central round of Lorca, whose execution will significantly delayed despite their need. "

Source: PSOE Lorca

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información