All projects have been awarded to companies Lorca, assuming a total investment of 517,392, 06 euros.
October 28, 2011.
The Speaker of Communication of the City of Lorca, Francisco Garcia, has been reported that the city council, the meeting of the Governing Board meeting this morning, for the award of a battery of improvement works that benefit the districts of Parish, Marchena, La Campana, Campillo, grill, and tendrils of Ramos.
Garcia explained that it is 7 projects involving a sum amounting to 517,392.06 economic euros.
We are talking about works under the collaboration agreement, for the execution of works in districts, Districts Councils and Lorca, being funded entirely by the CARM.
The relationship of the works, to detail is as follows:
Street lighting and replacement dashboards Hondo Road and Camino Fraile, Marchena, assuming a specific investment of € 66,943.45, and with a maximum execution time of the works of eight weeks.
A work that is included within the City Council bid to reduce power consumption and improve the systems of regulation and control of the vast network of existing lighting in our municipality, in accordance with the objectives set by the Local Agenda 21.
The works include the launch of 34 new points of light, which will improve road safety in this area.
Paving the Way of Josephine Olmo, Santa Gertrudis (Marchena), with an investment of € 79,850.
The deadline for execution of the works is three months.
It includes works in a kilometer.
This project is the result of regular meetings held the City Council with the various groups in the municipality.
Improvement works hard at turning of the parish, with a final investment estimated at € 100,100, being the maximum execution time of the works of two months.
The planned work will consist in improving the firm in a total distance of 1,700 meters, including the installation of tread throughout this section.
Packaging The Mill Road in the hamlet of La Campana.
Has an investment of 64,400, and the maximum execution time of the works shall be two months.
Includes 1 mile of improved road, proceeding to the tarmac and conditioning firm in this section.
Road resurfacing Hondo (Quijero way, the first step Raised) and refurbishment of ground on the way to La Torre, in the deputation of Campillo.
The deadline for execution of works shall be one month, assuming an investment of € 51,997.22.
Resurfacing the road between ctra.
c-15 and ctra.
mu-707, the deputation of the grid.
This is a work that has an investment estimated at € 59,692.40, and with a maximum execution time of the works of a month.
Rehabilitation and improvement of the pavement in different streets of Palm Zarcilla and El Rincón, with an investment of € 94,408.99.
The deadline for execution of works shall be two months.
Source: Ayuntamiento de Lorca