This is the Special Internal Reform Plans for buildings "Viña 5", "Domus Aurea" and "New Vine", which provide significant improvements reconstruction of 184 houses that had to be demolished after the earthquakes.
The Town Planning of the City of Lorca, José Joaquín Peñarrubia, has reported that the city council has got the approval of three major Special Internal Reform Plans that are decisive for the reconstruction of three blocks of flats in the neighborhood of La Viña, the hardest hit by the earthquake last year.
Planning the mayor said "thanks to the adoption of these three PERIS will be able to reconstruct three buildings that correspond to those in the large plot that has been in this neighborhood. Want to note that both the City Council, through technicians of the Department of Urban Planning, and from the Autonomous Region, has worked hard to expedite the formalities. We got everything approved in record time to enable the reconstruction of these buildings. "
Manzanera Peñarrubia explained that "these Special Plans have the full support of the residents, and include calls made by them to the City Council in the working sessions held on the matter. To get to the point where we're working fast and in coordination with the neighbors. Thanks to this work of La Viña neighbors who have lost their homes will be able to rebuild them according to your specifications. As common improvements to the reconstruction of these buildings, it is noteworthy to be building blocks housing will no longer downstairs floors, replacing these by other plants located in first, which also will feature a large underground garage, service co that many residents did not have before. plot will also be improved existing urban, allowing a transfer to new open area, which provided surface exceeds 2,000 square meters. Such improvements will assume that the urban environment of this part of the Vineyard will enjoy a marked improvement, house more comfortable, functional, and more brightly. "
The Town Planning noted that the adoption of these supposed PERIS make way for the reconstruction of 184 apartments spread over three buildings of 52, 44 and 88 stories each.
The number of homes remains the same, while the new building will allow the creation of new shop space, emphasizing the new urban profile that you want to give to this area of ​​the city.
The new buildings, in detail:
Building name: "Viña 5".
Overview: It has an area of ​​1,937 m2.
The new building will consist of 52 homes + shop space + garage.
The land has acquired the status of urban land.
The PERI is promoted by the City Council at the request of the Owners to facilitate reconstruction.
Improvements through the PERI: allows homogenize the maximum height allowed in the block A Partial Plan Vine, who is 5 now, as long as the use of non-residential floor.
This is allowed in the entire block except in the Street area Herrerías recayente Street Weavers corner where the maximum is 4.
The increased height will allow the building to be rebuilt in a better position, eliminating the narrow mezzanine had, which had a height ranging between 1.2 and 1.7 meters.
Building name: "Domus Aurea".
Overview: It has an area of ​​1,321 m2. The building will consist of 44 apartments + commercial + low garage floors.
It is located in the block recayente to Gardeners Street, in the unity of action of the Plan only partial Viña (URPI-13).
The PERI is promoted by the City Council at the request of residents.
These lands are located in urban land.
Improvements through the PERI: increase height is achieved máximay the building depth (which is 9.80 m.), Measures to rebuild the building in accordance with current legislation, which will provide wider areas and reclaim the space habitable housing.
It can build up to 5 plants, one more than before, provided that the use of non-residential floor.
Building name "New Vine".
Overview: It has an area of ​​3,163 m2.
The new building will consist of 88 apartments + commercial + low garage floors.
This is the south, block D-1, between the streets and Herrerías and Gardeners Harvest Avenue, the only unit in the Partial Plan of action of the vineyard (URPI-13).
The lands are located in urban land.
Improvements through the PERI: sort buildable space on this block and a change to building insulated building type.
This will create pedestrian areas, will provide natural light to the ground floor and creates new areas of ground to foster economic revitalization and mobility.
No increase residential buildable but buildable ground floor for common use, commercial and social.
Happens to have a structure similar to two "H" height views, which are joined by a common intermediate zone.
This apple can have seven buildings heights + ground floor + attic, as free as possible without courtyards and architectural and structural quality beyond doubt, suppressing ground floor apartments above.
Now the ground floors are diaphanous or commercial arcades and common basement for the entire block occupied part of the site.
Source: Ayuntamiento de Lorca