Portal de Lorca

www.portaldelorca.com

Lorca - SpanishLorca - English
detail of Lorca

 

The start of construction of complex reconstruction of the San Mateo Residential flats situated at 600 the number of homes demolished by earthquakes already in reconstruction (13/06/2013)

The floors which are becoming to lift pose 555 in total, to which are added 45 houses distributed in different parts of our municipality, some of which are already even inhabited.

The Mayor of Lorca, Francisco Jodar, this morning attended the ceremony to inaugurate the works to rebuild the few largest building had to be demolished as a result of severe structural damage caused by earthquakes in 2011.

This is the so-called "Residencial San Mateo".

The mayor has said that "the implementation of these works is a boost factor in the process of reconstruction. Few months ago we were to find that this process had reached a turning point, and we now see Lorca rises sharply. We talking about right now are getting to lift 600 homes of which had to be demolished because of damage caused by earthquakes. Among all Lorca we have made the reconstruction process is accelerating. Commissioning of the San Mateo Residential reconstruction is a remarkable breakthrough, since it is the building more houses met, and, location, in the heart of the town, became its demise in a psychological blow to many citizens. now solar moved by cranes , open spaces for work and movement, talking, ultimately, to get through hard effort by citizens and government, our city recover all spaces and images of the collective consciousness that the earthquake took away. A all Lorca our responsibility to work for the reconstruction are reflected in an important incentive for the revival of the economic and labor. We found a tool to fight the crisis, and we have to put all of us to take it. "

Recall that the license for Residential San Mateo reconstruction was granted by the council in August last year.

According to the project that was submitted to the Department of Planning in this regard by the Owners, the new building will have 95 homes, covering a surface area of ​​almost 12,800 meters square.

You will also have shops, assuming a total area of ​​1,586 square meters and 3 floors with 204 parking spaces and 113 storage rooms, which are specified in a total of 7742 meters square.

The property will retain its classic open structure to Avenida Juan Carlos I, to keep your profile commercial center of great importance to the city center.

Thanks to this reconstruction will enable the opening of a new pedestrian street that border the building, connecting the alley that runs next to the Cultural Center in Priest Street Emilio Garcia with Torrelorca Building arcades.

With this new access will center Lorca a major step forward in terms of planning and mobility.

Remember that the demolition thereof, made after verifying the impossibility of keeping up, began July 18, 2011.

Along with the works of this property should be noted that the City has already completed the paperwork to be rebuilt around 1,000 homes that the earthquake forced down.

In fact there are 2 buildings (Marsilla and Vina V), which includes a total of 64 dwellings, which are about to start its reconstruction, which were soon joined by other 8 buildings.

Source: Ayuntamiento de Lorca

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información