Portal de Lorca

www.portaldelorca.com

Lorca - SpanishLorca - English
detail of Lorca

 

Households in reconstruction after the earthquakes today represent 149,882.74 m2, an area larger than 23 football fields (19/08/2013)

The budget for conduct of these works of rebuilding these homes exceeds 59.8 million euros.

The surface reconstruction cuta housing exceeds over 8,900 m2.

The Town Planning Council of Lorca, José Joaquín Peñarrubia, informed on the latest data confirm the progress of the rebuilding process that is taking place in our city, noting that, today, is being carried to term jobs rebuilding homes that are a combined area of ​​149,882.74 m2 in rebuilding, equivalent to about 23 football fields.

In this sense, the mayor said that "these figures is more than double of that we gave to mid-February, which is a sign that the process of reconstruction of Lorca households is unstoppable and has all the facilities by the government, always ensuring the safety of buildings and individual and collective rights. "

José Joaquín Peñarrubia stressed that "the municipal technicians have developed some chips and a plane with leading tracking each reconstruction projects after the earthquake, which is updated daily."

The mayor explained that "for example, we can talk about that more than 700 homes in reconstruction have handed over the keys of 64 houses, which represent about 8,900 m2 and very soon we will post another 5 of a building in the Old Way Port ".

Peñarrubia said that "we were all aware that the recovery of our city after the drubbing 2011 earthquakes assumed it would be complicated and would entail outstanding effort by not only the government but also of the citizens themselves , and especially to the residents concerned.'ve spent many difficult times in which we had to modify the national and regional legislation and planning requirements to unlock certain issues. these vicissitudes the solving went through effort and many, many teamwork hours of meetings both Lorca and Murcia and Madrid, and now you see the results. Indeed, we anticipate that, on the surface above will be shortly adding many thousands of m2 corresponding to reconstruction of other buildings also had to be demolished for the damage caused by earthquakes, which already granted the relevant license from this Department.

They start rebuilding 12 homes in the House of Calderones

Councillor stressed the last building that started its reconstruction has been the home of the pilot whales, a building located on Calle Marsilla number 14, which has retained its facade, including the reconstruction of 12 houses with a total of 620 647, 35 euros and 1522.4 m2.

This new building includes a ground floor for 12 parking spaces and a space.

"This is an important step in the recovery of our historic building," said the councilman.

Source: Ayuntamiento de Lorca

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información