Portal de Lorca

www.portaldelorca.com

Lorca - SpanishLorca - English
detail of Lorca

 

The PSOE requested mediation Noksel Mayor to build the pipeline that will convey water from the desalination (03/10/2013)

The Municipal Socialist Group spokesman, Manuel Soler, began his appearance expressing "dismay at the possible purchase by a company of Vitoria of the tubes required for installation of the pipeline to transport the water from the desalination Eagles. From Municipal Socialist Group have made inquiries about the installation of the pipe, the company has awarded Acuamed Altec SA company. Results are that the purchase of the tubes is in advanced stage and the recipient of basket is installed in Vitoria. It seems incredible when Lorca is located Noksel SPAIN SA company, which is a manufacturer of this type of material. "

"The pipeline will be installed immediately, states the Minister Arias Cañete, only manufactured by two companies in Spain. One of them, tubular STS group SA, is located in Vitoria and the other company is Noksel SPAIN SA, located in Lorca, particularly in the industrial area of ​​Saprelorca "he clarified.

The social responsibility added that "for transportation of 10,000 meters of pipe will need to pay 200 trailer truck freight. The total cost is between 160-200000 euros.'s So surprising that no efforts have been made to the purpose of not having to pay with public money and the irrigators this figure. "

Soler has reported that "on September 17, the Minister of Agriculture, Mr. Arias Cañete, visited the start of construction of the pipeline that will carry water from the desalination of Eagles-Guadalentin from Cerro Colorado raft until Well districts Higuera, almond and Listen. This investment is the first phase of a work that, when completed, will allow desalinated water is used in all of the land irrigated by the Irrigation Communities of Lorca and Puerto Lumbreras, totaling 27,000 hectares. within the total cost of the work is that of the pipe itself, amounting to approximately EUR 2.5 million. Investment is framed within Lorca + Plan. regard to this investment, the plan itself provides that this project will create jobs and wealth. remember that 80% of the funding is public ".

Lorca The mayor stressed that "the Irrigation Communities show their interest because the purchase is made in the factory of Lorca, and it was approved by the Governing Board of the Community Irrigation Lorca on September 25, authorizing its president to take steps in that direction. believe that once installed the pipe, this will result in failure. repairs to such equipment technicians are needed as well as small purchases can subsequently damaged tubes. would be much faster economic and the subsequent service from the factory gave Lorca. "

Manuel Soler has finished explaining that "once again, money that could be in our town this time will go to the communities of Madrid and the Basque Country. We have proposed in a letter to Mr. Jodar that, as mayor of the municipality, mediates between the two companies in order to get them to agree, so that those 2.5 million honor the commitment given in the Plan document Lorca: create jobs and wealth in our town.'ve also requested involving the Autonomous Region in this issue. "

Source: PSOE Lorca

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información