Portal de Lorca

www.portaldelorca.com

Lorca - SpanishLorca - English
detail of Lorca

 

The 40 residents of the new building of the Santa María Alcázar receive their homes Friday morning (08/05/2014)

Households reconstructed number reaches 130, while others 770 are reconstructed.

In the coming months the number will reach 500 homes rebuilt. The new building has a garage and elevator (services that previously lacked) and insulation elements for high-efficiency energy sustainability.

The Mayor of Lorca, Francisco Jodar has informed that the Board of Government to be held weekly Friday morning contemplates the adoption of a series of 40 Certificates of Habitability corresponding to as many homes have their reconstruction completed after having to be demolished a result of the earthquakes of 2011. This is the story concerning the reconstruction of the building of the Santa María Alcázar, whose bonds will be delivered tomorrow afternoon to the respective owners at 6 pm at the property itself.

It should be noted in this regard that the reconstruction of this new building, which replaces the previous opened in 1965, have joined two communities of owners to form a single, which was used to be managing the paperwork related to the process to re-build the set housing.

As new.

The rebuilding has served to neighboring homes have in place that comply with the latest building regulations, including those relating to elements of isolation and sustainability criteria.

The new block has a lift, an element that did not exist before, and an advanced energy rating, somewhat larger upper floors through the flight has been carried out, allowing solar panels to preheat water deposits on each floor, so as communications service connections (internet, phone and TV) in all rooms.

New fences and PVC joinery that have been installed to help consolidate a notable improvement in energy efficiency.

The new Santa Maria del Alcázar building features a sensitive aesthetic improvement over the previous, is equipped with 40 parking spaces, 1 house, a service that did not previously.

This significant improvement has been possible because the City has allowed the use of the subsoil, which has also enabled the creation of access roads.

In concrete figures, we are talking about the surface of the car park is almost 1,400 m2.

The Mayor has conveyed its congratulations to all residents of the building, noting that their daily efforts and desire to overcome that have already demonstrated these past months have now rewarded.

It is noteworthy that the neighbors have opted for both the company that has executed as ancillary works have been Lorca, an exercise in responsibility to the recovery of our city that both institutionally the City Council, as personal and Mayor of Lorca I want to place as a role model.

We suggest that these 40, the number of reconstructed dwellings stood at 130.

Source: Ayuntamiento de Lorca

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información