Portal de Lorca

www.portaldelorca.com

Lorca - SpanishLorca - English
detail of Lorca

 

The Ministry of Agriculture awarded the works of a general collector of sanitation in the hamlet Lorca de Marchena (21/10/2015)

The Ministry of Water, Agriculture and Environment has awarded the contract for the general collector of sanitation in the area Entredicho Contreras, in the hamlet Lorca de Marchena, amounting to 283,000 euros, financed by the Cohesion Fund of the Union European by 80 percent.

The expected completion date is December 2015.

The aim of the work is to provide drainage system wastewater that area, which currently do not have this service, and its connection with the general collector Rambla Biznaga, for transport to the industrial water treatment Lorca .

Thus it eliminates spillage underground through existing septic tanks, and service will be offered to about 70 people.

The collector of sanitation works depart from a well located in Casa de Linares until joining the aforementioned general collector.

The total length of 2065 meters collector will be formed with corrugated PVC pipe and connections to rush home.

Source: CARM

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información