Some 300,000 citizens of the geographical area of Lorca and Guadalentín will strengthen the quality of power they receive through this a new power line, said today the Director General of Industry, Energy and Mines, Horacio Sanchez.
The new line, which is 24 km long double circuit and a voltage of 132 kilovolts, which currently run link between Totana and Alhama, Sierra de la Tercia.
The Directorate General of Industry, Energy and Mines this week authorized the installation of this service "is the first step towards strengthening the electricity supply in major geographical areas Guadalentín and Northwest, which had a shortage in this regard, since the area Lorca was powered by a 132-kilovolt line that came from Cartagena, "said Sanchez.
He added that this new line "will address the development of urban character and business generated in its own region."
The facility has the latest technology in electricity distribution infrastructure, "constituting a vital element for the economic future of the Lorca area, which will significantly improve the quality standards of electricity supply throughout the region, while that will enable a reduction in electricity losses and carbon dioxide emissions, "said Sanchez.
Source: CARM