It will build a general collector of 2.3 kilometers of pipeline and a range of connection and entry of 206 meters.
The project has been approved. |
Water Councilman City of Lorca, Melchor Morales, has announced that it will build a sanitation collector will serve the neighboring corner Carranza.
Morales stated that this is a project to improve sanitation infrastructure, along which the sharp wastewater and stormwater from the corner to Zarcilla Palm Carranza and a connection cradle that serves to make the junction between the sewage system of the parish and the future collector.
These works involve the construction of a collector general drainage of 2.3 miles of PVC pipe with a diameter of 400 mm, which will connect with Zarcilla Rincón de Ramos, is also considered the construction of a range of inlet connection the sewerage system in the corner, which will have pipe 206.54 meters of the same diameter.
From the city council have detailed the budget is around 771,000 euros, having that work with a deadline of 4 months under construction.
The project for the construction of this infrastructure are already approved by the Autonomous Community, and includes memory, general plans and details, statement of special technical requirements, budgets, program development work, study safety and health and the corresponding geotechnical study.
By the type of work is not necessary to prepare an environmental impact study.
This collector will directly benefit a total of 1,077 citizens in the area.
Melchor Morales, mayor of Water, said, moreover, that these works, 100% funded by the Regional Government through the Ministry of Water, represent significant progress in expanding water sanitation services and continue the development and consolidation of infrastructure in water.
Source: Ayuntamiento de Lorca