The improvement works have basically consisted of installing a new underground pipeline has a larger diameter and is safer than the last.
This amount is attached to the 240,000 euros invested in Alfonso X and Coy 88,500
Water Councilman City of Lorca, Melchor Morales, has reported that the city council has invested a total economic amount of 55,840 euros in the works aimed at the renewal of drinking water on the road to the Alporchones.
It is an enclave located in the hamlet of watering places.
Morales has detailed construction work has provided a total length of 1,100 meters, in which we have proceeded to the replacement of existing pipeline infrastructure.
In this regard it is noteworthy that we changed the material which the said section had a diameter of 75 mm of cement, a new one that is 110 mm and is made of high density polyethylene, which supports a pressure of 16 atmospheres.
It is a more modern and secure pipeline.
The network segment has 25 units of attack of the environment that are supplied to 120 households.
Melchor Morales has also indicated that this action is included in the different enhancements that are taking terms from the municipality of Lorca, in direct collaboration with the company Aguas de Lorca, with the objective of modernizing the infrastructure of water supply and sanitation drinking water.
The objective of this City is that Lorca living in hamlets have the same services as those living downtown.
This is a set of works that includes improvements in various parts of the municipality.
In the case of the Alporchones road, we are talking about improving the water supply to more than 360 people living in the area.
These advances in water supply and sanitation infrastructure of drinking water in addition to the work being completed in the neighborhood of Alfonso X, which involves an investment of 240,000 euros, and those executed in the village of Coy, who have had an investment of 88,500 euros.
Source: Ayuntamiento de Lorca